适用行业
- 电池
服务
- 硬件设计与工程服务
客户
未公开
关于客户
一些电池公司。
挑战
电池堆的尺寸和制造传统液流电池所需的昂贵材料阻碍了该技术在商业上的可行性。该解决方案需要在不损失任何功率的情况下使堆栈更小、更便宜。
解决方案
UTRC 开发了一种电能存储系统,该系统在功能和成本方面均优于当前产品。 UTRC 的液流电池储能技术消除了现有电能存储选项的挑战,这些选项受地域限制、不可扩展或成本过高。软件组件 - UTRC 液流电池技术
收集的数据
Battery Charge Level, Battery Voltage, Energy Production, Production Efficiency, Solar Power
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Battery manufacturer Industrial Digital Twin
For optimum control of product quality, Banner relies on a high production depth. Its 560 production employees produce nearly all the components in¬-house that they need to make finished batteries on Banner’s six assembly lines. This includes the plastic parts for the battery cases as well as the paste-filled lead oxide grids. Their production involves two to five¬ days rest in maturing chambers to create optimum current absorption and storage capacity. Banner’s ongoing success was accompanied by a continuous, organic growth of the production facilities, adding or extending hall after hall until the complex filled the site that had seemed ever so spacious when the company moved here from a smaller place in 1959. These developments led to a heterogeneous production environment. “This confronts us with significant challenges, particularly concerning intra¬logistics issues, such as scheduling for the maturing chambers,” says Franz Dorninger, technical director at Banner. “We contemplated various ways to overcome this problem, including relocating to new premises.”
Case Study
Delivers Seamless Scalability to IOTATOI
IOTATOI is a division of Power Agent Systems that has developed an edge server called the Universal Monitoring System (UMS). IOTATOI is using UMS as an edge tier data collector to monitor backup battery arrays in manufacturing, mines, and chemical plants. This experience with battery backups led IOTATOI to expand the system to any condition that can be monitored by sensors such as vibration, heat, temperature, and flow. IOTATOI found they needed to move from their original middleware to something that would allow greater scalability and to also present information in a much broader way allowing them to dynamically look at the information and perform benchmarking analysis, feeding the data into analytics engines and creating a much more actionable view.
Case Study
GM Global Battery Systems Lab
Testing expensive battery prototypes is an around-the-clock job for the engineers at GM’s Global Battery Systems Lab. Excessive heat or high voltage can make batteries unstable or vulnerable to damage. Confirming the reason for the alarm and eliminating fault alerts sometimes requires onsite investigation, often at non-business hours.
Case Study
AUTOSAR-based Battery Management System
We aimed to build an advanced BMS with improved accuracy of SoC and SoH algorithms for hybrid electric and electric vehicles. Our demo was built using automotive grade components and designed to conform to ASIL-D certification. The scope of work covered such safety features as Over/Under Voltage, Over/Under Temperature Protection, Short Circuit Detection, Cell Balancing, CAN Communication, and Faults Handling. Read the full case
Case Study
LoRaWAN - Helping citizens and organizations to reduce environmental impact
More and more, our world is becoming aware about the environmental print that comes with population growth, limitation of resources, climate change and the need for sustainability. The biggest challange here was to raise awareness among citizens and organizations about their environmental impact, and to help themto reduce it in a sustainable way with the help of Real time data.