适用行业
- 建筑物
- 设备与机械
客户
标准行业
关于客户
Standard Industries是一家对建筑材料感兴趣的全球性工业公司,包括全球最大的屋面和防水制造商,以及太阳能、骨料和相关投资业务。作为一家业务遍及四大洲的全球性公司,Standard Industries 在遍布 80 个国家/地区的 184 个地点拥有 15,000 多名员工。
挑战
Standard Industries 发现协作和简化通信是一项艰巨的任务。安排高级领导会议的简单练习需要几位行政助理一起通电话以确定是否有空。此外,他们在公司范围内拥有超过 28 个活动目录环境以及四个不同的邮件和协作平台。他们需要一个单一的协作工具来帮助他们在四大洲的所有地点实现统一。
解决方案
为了应对这些挑战,Standard Industries 与 Maven Wave 合作迁移到 Google Workspace。迁移从小规模开始,仅迁移了公司的纽约市办公室,并且仅迁移到了 Gmail 和 Google 日历。然后,在 Maven Wave 的变更管理指导下,该团队将整个公司转移到了 Google Workspace,包括 Google Drive、Docs、Sheets 和 Slides。
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.