挑战
因此,常见的纸张破损会导致长达 60 分钟的停机时间,从而延迟每小时 1 万美元的潜在生产价值流程。因此,有缺陷的产品会造成财务损失并损害公司的声誉。提高质量和降低缺陷率每年可为您的公司带来数百万美元的收入。
解决方案
Qsee 能够在生产过程中预测和优化质量测试,让操作员节省时间并获得所有生产产品的正确见解。
收集的数据
Accuracy, Fault Detection, Operation Performance, Production Efficiency, Response Time
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Wireless Improves Efficiency in Compressed Air Systems
Hollingsworth and Vose wanted to improve the efficiency of their compressed air system, lower the electricity expense component of manufacturing cost in their commodity industry, and conserve energy leading to lowered greenhouse gas emissions. Compressed air systems degrade over time and become leaky and inefficient. Hollingsworth and Vose wanted to increase the frequency of system inspections without paying the high cost of manual labor.
Case Study
Industrial Video Monitoring for Security and Regulatory Compliance
Because of the Stevenson mill’s proximity to the Tennessee River, WestRock was required by the USCG to comply with the Maritime Security 33CFR (MARSEC) regulations. WestRock needed a video security system but wanted to add other applications not required by the government, such as video process monitoring, condition monitoring, and wireless network management. WestRock needed a reliable video solution to avoid the compliance fines and possible security risks – but the solution needed to be implemented in the most cost-effective manner possible.
Case Study
ECOsine Active Increased Reliability in the Paper Industry
The paper and pulp industry is interlinking intelligent hi-tech machines to highly efficient production lines. Higher power DC and AC motor drives perform the automation tasks. Every kind of interference that negatively affects the reliability and safety of the installation may lead to production downtime and consequently to significant financial losses. AC and DC motor drives are so-called non-linear loads as they draw a nonsinusoidal current from the grid. Resulting harmonics of current and voltage can interfere with the operation of nearby consumers and overload the electrical infrastructure. In this particular application, the load cycles of the drives often caused interruptions in the production process because of disturbances coupling into the fieldbus system.
Case Study
Covantis Case Study: Modernizing Global Supply Chains with ConsenSys Blockchain Solutions
The global agricultural trade industry has been grappling with outdated and inefficient processes. The industry has not seen significant technological innovation since the mass adoption of email 30 years ago, making global supply chain management increasingly challenging. The need to track more partners, suppliers, and endpoints has become more complex, and post-trade execution remains highly manual, repetitive, costly, and time-consuming. The industry is heavily reliant on paper-based processes and email exchanges, with over 275 million emails exchanged annually to process an estimated 11,000 worldwide shipments of grain. Paper-based certificates and bills of lading are not easily exchanged among multiple parties, and replacing them if misplaced is costly. The COVID-19 pandemic has further disrupted supply chains due to interruptions to paper document deliveries and the increasing necessity to work from home, accelerating the need for digital transformation.