技术
- 应用基础设施与中间件 - 数据库管理和存储
- 基础设施即服务 (IaaS) - 云数据库
适用行业
- 设备与机械
- 电信
适用功能
- 销售与市场营销
- 仓库和库存管理
用例
- 拣选/分拣/定位
- 基于使用的保险
关于客户
该客户是一家美国健康保险公司的医疗保险营销部门。他们专注于收购工作,缺乏用于会员沟通和保留工作的 CRM 数据库。其目标是促进电子通信作为一种节省成本的举措,并收集会员电子邮件地址和未来通信的选择偏好。
挑战
一家美国健康保险公司的医疗保险营销部门没有适当的数据解决方案来提取和输出非授权的营销活动数据。他们缺乏 CRM 工具和 CRM 数据库,并且多个数据源系统各自为政。
解决方案
作者建议使用 Alteryx Designer 作为处理数据提升的临时解决方案,直到公司采用 Adobe Campaign Engine。 Alteryx Designer 用于拉入三个管道分隔文件,清理并将它们输出为三个 Alteryx 文件。它还用于营销活动处理、报告以及创建用于细分和定位的查找表。数据库内工具用于连接到 Teradata 中的企业数据仓库,以开展有针对性的活动。创建日常操作文件检查是为了监视和审核输出到 Tableau 仪表板的数据。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.