技术
- 分析与建模 - 实时分析
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 设备与机械
适用功能
- 产品研发
用例
- 行为与情绪追踪
- 实时定位系统 (RTLS)
服务
- 测试与认证
关于客户
Canva是一个在线设计和发布平台,总部位于澳大利亚悉尼,为非设计师提供用户友好的设计工具。 Canva 在 190 个国家/地区拥有超过 6000 万月度用户,创造了超过 70 亿个总设计。该平台旨在帮助非设计师创造专业品质的设计。
挑战
Canva 希望为非技术利益相关者提供自助数据,以便根据需要深入到不同的领域。他们有一个数据仓库,但对于普通用户来说进入门槛有点太高了。为了大规模发展 Canva,非技术人员需要细分受众并创建渠道。产品经理很难深入研究新版本并了解新功能的表现或了解漏斗的详细情况。发布后不久,团队就发现需要更详细的产品分析解决方案。
解决方案
Canva 在数据之旅的早期就采用了 Amplitude 作为数字产品分析和增长工具,因为它是可用于漏斗分析和细分的最佳平台。借助直观的用户界面和灵活的事件模式,可以轻松“分割”不同的属性,用户可以动态更改仪表板并快速查看结果。 Amplitude 还可以轻松发现和解决问题,作为 Canva 的主要实时用户行为监控工具。它有助于通过其漏斗和路径工具快速识别问题。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.