技术
- 自动化与控制 - 监督控制和数据采集 (SCADA)
适用行业
- 设备与机械
适用功能
- 离散制造
用例
- 过程控制与优化
客户
Maschinenfabrik Gustav Eirich 集团
关于客户
Maschinenfabrik Gustav Eirich Group 旗下的公司在加工自由流动材料、浆料和污泥领域提供机械、设备和服务。专业的核心领域是连续和不连续的混合过程,颗粒
挑战
Maschinenfabrik Gustav Eirich 在工业材料加工方面提供全面的服务。重点是用于混合、造粒/制粒、干燥和细磨的机器、设备和服务。主要应用领域为混凝土、干砂浆、灰泥、建筑材料、砂石灰砖、陶瓷、玻璃、碳素制品、摩擦衬片、电池化合物、冶金、铸造型砂和环保。该公司希望成为确保在整个混合过程中始终如一、顺畅和高效的生产过程的先驱。目的还在于提高使用新用户界面的乐趣。
解决方案
该公司现在使用的 Multi-Touch 应用程序具有现代设计元素和符合人体工程学的操作理念。对于现代多点触控解决方案,Eirich 使用 Zenon、COPA-DATA 的 HMI/SCADA 软件和 Microsoft Windows 7 作为操作系统。得益于 Multi-Touch 技术和大屏幕元素,应用程序可以用手指很好地操作。可以通过虚拟键盘或在模式对话框中的上下文菜单的帮助下输入数据。软件组件 - Zenon:来自 COPA-DATA 的 HMI/SCADA 软件 - 多点触控应用程序
收集的数据
Machine Documentation, Machine Utilization Rate
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.