The Customer
Not disclosed
About The Customer
The customer is a Fortune 500 industrial supply company that prides itself on quick delivery of a wide range of products. The company recently opened a new distribution center, which was experiencing consistent network failures multiple times per day. This was causing a halt in automation and forcing staff to manually fulfill orders, slowing deliveries and straining relationships with customers and suppliers. The company's revenue fell, and future sales were affected. The new center was operating only at 10-20% capacity, and the company needed to ramp up capacity to 100%, but had concerns about potential network issues.
The Challenge
A Fortune 500 industrial supply company was facing consistent network failures multiple times per day at its newly opened distribution center. This resulted in a halt in automation, forcing staff to manually fulfill orders, which in turn slowed deliveries and strained relationships with customers and suppliers. The company's revenue fell, and future sales were affected. The new center was operating only at 10-20% capacity. The company needed to ramp up capacity to 100%, but had concerns about potential network issues. They onboarded a global leader in material handling systems to fix the problem, who then brought on Belden to uncover any issues or misalignment with the facility’s network.
The Solution
Belden performed an in-depth Network Assessment evaluating the existing network’s hardware, configuration, backup systems, scalability, and security posture. The assessment revealed multiple concerns that could lead to network failures, including lack of device segmentation, slower switches on the network backbone, outdated hardware, lack of authentication for security, lack of visibility for proactive system issue detection, and a lack of consistent and reliable protocols. Belden identified actionable recommendations to address and resolve the primary causes of the new facility’s system failures, delays, and poor network performance. The recommendations included segmenting the overall network, implementing proactive management, implementing Precision Time Protocol (PTP), employing cable management best practices, and preventing unnecessary network traffic. When these recommendations are followed, the company can reliably and safely ramp up to 100% capacity without further harming customer confidence and supplier relationships.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.