Technology Category
- Application Infrastructure & Middleware - Database Management & Storage
- Infrastructure as a Service (IaaS) - Cloud Databases
Applicable Industries
- Equipment & Machinery
Use Cases
- Time Sensitive Networking
About The Customer
Adidas is a multinational corporation, founded and headquartered in Herzogenaurach, Germany, that designs and manufactures shoes, clothing, and accessories. It is the largest sportswear manufacturer in Europe, and the second largest in the world, after Nike. The company was in need of a solution to automate the process of updating PowerPoint presentations with new data, a task that was time-consuming and prone to errors.
The Challenge
Adidas was facing a challenge with the repetitive task of updating PowerPoint presentations with new data. The process involved downloading data from a database, storing it in Excel, and manually copying and pasting it into PowerPoint. This process was not only tedious but also prone to errors. The company was looking for a solution that could automate this process, saving time and reducing the possibility of errors.
The Solution
Adidas implemented a solution based on the Slide Compiler approach, which included a macro for updating PowerPoint slides. The process involved creating a PowerPoint template with unique strings replacing all values. A copy of this template was then created and unzipped to a separate folder. A mapping table was created with the columns Name and Value, where Name contained the dummy strings and Value contained the real data. Each slide was stored as an .xml file and imported into Alteryx. The mapping table and the slide xml file were connected to the PPTX_macro_values.yxmc macro. The macro replaced the dummy data in the xml string with real data from the mapping table. The final .pptx file was generated by zipping up the replacement folder and renaming it to a .pptx file.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.